HSIP Cycle 10 Pedestrian Improvements
The work includes removing and installing signs, removing and installing pavement markings, installing crosswalks, demolishing existing pavement, demolishing and installing curb, gutter, and sidewalk, installing curb ramps, pavement rehabilitation, installing a raised crosswalk, and traffic control.
Specifications
(click to expand/collapse)
Name | Size | ||
Dixon HSIP Cycle 10 - 100% Design EOPC | 153.2 KB | ||
Dixon HSIP Cycle 10_Bid Specs | 448.0 KB |